APS:高级计划和调度

“高级计划与调度”(Advanced Planning and Scheduling,简称APS)是一种广泛应用于制造业及综合领域的管理方法。APS的缩写形式便于日常书写与快速交流,旨在优化生产流程、提升资源利用效率,并有效协调生产计划的制定与执行环节。

Advanced Planning and Scheduling具体释义

  • 英文缩写:APS
  • 英语全称:Advanced Planning and Scheduling
  • 中文意思:高级计划和调度
  • 中文拼音:gāo jí jì huà hé diào dù
  • 相关领域aps 制造业

Advanced Planning and Scheduling的英文发音

例句

  1. Research on Genetic Algorithms for Advanced Planning and Scheduling(APS) Problems
  2. 遗传算法在高级计划与排程问题中的若干应用研究
  3. Study and Design of Advanced Planning and Scheduling(APS) for QM ERP
  4. 启明ERP混流生产计划的研究与设计
  5. The concept and the theoretical base of the advanced planning and scheduling system ( APS ) have been described in this article, which has indicated the necessity for the development and application of APS in the heavy forging manufacturer.
  6. 探讨了先进的计划与排产系统(APS)的含义和理论基础,指出了在大锻件企业开发和应用APS的必要性。
  7. Discussion of Advanced Planning and Scheduling(APS) System ERP is the symbol of advanced management.
  8. 揭开先进计划系统的神秘面纱企业资源计划(ERP)是先进管理的代表。
  9. The advanced planning and scheduling system is the supplement for the traditional Enterprise Resource Planning system. It can provide a company with real-time adjustable optimal production plan with constrained capacity.
  10. 高级计划与排程系统(APS)是传统企业资源管理系统(ERP)计划部分的补充,可以为企业实现具有产能约束,并可以实时变动的最优计划。