MPS:主生产计划
“主生产计划”在商业领域被广泛应用,常缩写为MPS,以方便快速书写和日常使用。这一术语常用于生产和供应链管理,有助于企业高效安排资源和制定生产策略。
Master Production Schedule具体释义
Master Production Schedule的英文发音
例句
- Forecasting Master Production Schedule(MPS) ( MPS ) correctly is an important but difficult issue of Enterprise Resource Planning.
- 准确地进行主生产计划(MPS)预测是企业资源计划管理的重点和难度问题。
- This paper introduces a master production schedule planning information system on a factory level. It is made on the basis of the MRP theory and can be realized on a microcomputer by using dBASE ⅲ. Its logic model and control structure are also given in the paper.
- 本文介绍了一个根据MRP思想利用dBASEⅡ在微型机上实现的厂级生产作业计划信息系统,并给出了系统的逻辑模型和控制结构。
- Master Production Schedule(MPS) ( MPS ) is the core of ERP. MPS focuses on production plan and schedule, plan drive and storage control so that it can guarantee the fluency and optimization of the production.
- 其主生产计划(MPS)(MasterProductionSchedule,MPS)模块是ERP的核心部分,主要涉及生产计划的制定和排产,整个生产计划的驱动和库存量的控制,从而保证生产的流畅和优化。
- Research of master production schedule in the manufacturing ERP system
- 制造业ERP主生产计划(MPS)模块研究
- ARMA-BP model for optimizing master production schedule in process enterprises
- 流程型企业主生产计划(MPS)优化的ARMA-BP模型
本站英语缩略词为个人收集整理,可供非商业用途的复制、使用及分享,但严禁任何形式的采集或批量盗用
若MPS词条信息存在错误、不当之处或涉及侵权,请及时联系我们处理:675289112@qq.com。