EVM:挣值管理
“挣值管理”是“Earned Value Management”的中文译名,通常缩写为EVM,便于日常使用和书面表达的简洁性。这一术语在学术研究,尤其是气象学等科学领域中应用广泛,用于衡量项目绩效和进度管理,具有重要的实际意义。
Earned Value Management具体释义
Earned Value Management的英文发音
例句
- Gain high-level skills in WBS and RBS development, resource loading, and earned value management.
- 获得WBS和RBS发展、资源负荷水平、价值管理的技能。
- This paper elaborated the comprehensive analysis and control progress on the cost by earned value management which means analyzing and controlling the budget and actual costs.
- 文章详细阐述了用挣值法进行费用、进度综合分析与控制,即对已完工作预算费用、计划工作预算费用和已完工作实际费用的分析与控制。
- A Study of Cost Control in Construction Project Based on Function-cost Analysis Earned Value Management(EVM)
- 基于功能成本分析挣值管理(EVM)的施工项目成本控制研究
- The application of the earned value management in the monitoring of cost and supervision of the highway construction project is studied according to an instance in this paper.
- 文章重点结合一个实例对挣值法在高速公路建设项目成本与进度监控中的应用进行了探讨。
- A Multi-factor Performance Evaluation Method of Shipbuilding Based on Earned Value Management(EVM)
- 基于挣值分析的船舶建造多要素绩效评价方法研究