CRM:成本/资源模型
“成本/资源模型”(Cost/Resource Model),在商业领域广泛简称为CRM,以便在日常沟通和书面材料中快速书写与使用。这一术语常用于描述在企业管理中涉及成本控制、资源分配与优化分析的重要模型工具。
Cost/Resource Model具体释义
Cost/Resource Model的英文发音
例句
- It gives eight rules of process organizing, and then discusses the deposing of process, the calculating of process model, the method of reducing the cost, and the resource assignment model.
- 然后讨论了过程的分解和活动间的关系、过程模型的进度计算以及减少过程开销的方法等问题,最后提出了人力资源调度模型。
- A new cost model is given, considering resource finding cost and resource deciding cost beyond traditional model.
- 给出了一个新型的代价模型,它比传统的代价模型更多地考虑了资源发现代价和资源决策代价。
- The vehicle influence to traffic crowing 、 cost 、 environment and resource is analyzed and the model of utility-function is put forward.
- 车的方面主要是从出行的机动车辆所造成的交通拥挤、出行成本和环境能源方面进行分析,提出了效用函数模型。
- Upon the substitution character of human resource, a new Time / Cost optimization model under resource constraints and a human resource substitution model under partial resource constraints are constructed respectively.
- 基于人力资源的可替代性,分别构造出一种新的人力资源受限下的时间-成本优化模型和人力资源部分受限下的资源替换补给模型。
- Under the condition of developing cost of a gas tubine defined as a resource constraint, the optimal allocation model for gas turbine reliability, which is of great value to real engineeing, is proposed on the basis of results of the above fuzzy prediction.
- 然后在此基础上,以研制费用作为资源约束,提出一个具有实际工程应用价值的燃气轮机可靠度优化分配模型。
本站英语缩略词为个人收集整理,可供非商业用途的复制、使用及分享,但严禁任何形式的采集或批量盗用
若CRM词条信息存在错误、不当之处或涉及侵权,请及时联系我们处理:675289112@qq.com。