MRA:重大风险评估
“重大风险评估”(Material Risk Assessment,简称MRA)是企业和商业实践中广泛使用的专业术语,用于快速识别、分析与应对组织所面临的关键潜在风险。通过系统评估,企业能够提前发现运营、财务或战略层面的重大隐患,从而制定有效的防范和管控措施,提升整体抗风险能力。该缩写在日常沟通和文件撰写中应用普遍,有助于提高信息传递的效率和准确性。
Material Risk Assessment具体释义
Material Risk Assessment的英文发音
例句
- Material Misstatement Risk Assessment in Audit
- 审计重大错报风险评估识别与分析
- Railway Material Procurement Tender Risk Assessment Study
- 铁路物资采购项目投标风险评价研究
- In addition, while we review the theoretical results and literature material on financial risk assessment, the paper discusses the theory concepts of financial risk management.
- 另外,在综述国内外关于财务风险评价的理论成果和文献资料时,本文对财务风险管理的理论概念进行了论述。
- The core part of spatial decision support system for hazardous material ( hazmat for short ) transportation is risk assessment and optimal path choose.
- 危险品运输空间决策支持系统的核心部分是危险品运输风险评价和路径决策。
- The result of supervision audit show that the implementation of the material measures of different degrees, directs effectively the enterprises are engaged in railway construction to strengthen the hazard identification, risk assessment and control.
- 监审结果说明,这些对策不同程度的实施,有效指导了从事铁路项目施工的企业加强危险源辨识、风险评价和风险控制工作。
本站英语缩略词为个人收集整理,可供非商业用途的复制、使用及分享,但严禁任何形式的采集或批量盗用
若MRA词条信息存在错误、不当之处或涉及侵权,请及时联系我们处理:675289112@qq.com。