RV:资源向量
“资源向量”(Resource Vector)在商业与管理领域中常被简写为RV,以便于日常书写和使用更加高效便捷。作为一种常用的专业术语,它主要用于描述企业或项目中的各类资源配置情况,帮助管理者更清晰地分析资源分布与优化策略。该缩写形式因其简洁明了的特点,在商务沟通、报告撰写以及学术讨论中得到了广泛应用。
Resource Vector的英文发音
例句
- Water resource price could be confirmed through water resource price vector and vector result of water resource fuzzy synthesis evaluation.
- 通过水资源价格向量与水资源模糊评价的向量结果确定水资源价格。
- To predict the resource requirement of system in dynamic environment, a model of resource allocation based on Support Vector Machine regression algorith has proposed.
- 为了预测系统中动态变化的资源需求,提出一种基于支持向量机回归算法的动态资源分配模型。
- Research on land resource eco-security assessment based on Support Vector Machines
- 基于SVM的区域土地资源生态安全评价研究
- The renovation and vector treatment was made for resource space data of producing, lastly, vector chart of climatic resources and crop agri climatic zoning was shown on.
- 对生成的各种资源空间数据,进行多种图形整饰和矢量化处理,制作出气候资源和作物农业气候区划矢量图产品。
- Considering the CPU time and energy which are two representative kinds of resource constraints, a feedback scheduling technique of computing resources based on support vector machines and a feedback scheduling technique based on fuzzy logic for power-aware systems are designed respectively.
- 重点考虑CPU和能量这两类资源约束问题,分别提出了基于支持向量机的计算资源反馈调度和基于模糊逻辑的能量资源反馈调度方法。
本站英语缩略词为个人收集整理,可供非商业用途的复制、使用及分享,但严禁任何形式的采集或批量盗用
若RV词条信息存在错误、不当之处或涉及侵权,请及时联系我们处理:675289112@qq.com。