ROS:日程安排

“Run Of Schedule”在商业领域是一个高频术语,通常缩写为ROS,以便书写和使用更高效。其含义指“日程安排”,常用于媒体投放、项目规划等场景,强调按预定计划执行任务或分配资源。

Run Of Schedule具体释义

  • 英文缩写:ROS
  • 英语全称:Run Of Schedule
  • 中文意思:日程安排
  • 中文拼音:rì chéng ān pái
  • 相关领域ros 常用

Run Of Schedule的英文发音

例句

  1. Only as they run out of features to eliminate will they slip their schedule.
  2. 只有当他们在用尽要消除的特性时,他们才放开他们的进度。
  3. However, if a schedule begins to run before you have completed your modifications, the earlier version of the schedule is used.
  4. 不过,如果计划在您完成修改之前已经开始运行,则使用计划修改前的版本。
  5. To ensure the requirements of the hard real-time tasks, these tasks were organized in a run queue pointed by run_ - queue [ 0 ], an element of a point array, and FIFO schedule strategy was used for them.
  6. 为严格保证硬实时任务的实时性,将其单独放在一个队列中,由指针数组的元素run-queue[0]指向,采用FIFO调度算法;
  7. The soft real-time tasks and non real-time tasks were put into the other run queue pointed by run_ - queue [ 1 ], the other element of the point array, and RR schedule strategy was used for them.
  8. 软实时任务和非实时任务放在一个队列中,由指针数组的元素run-queue[1]指向,采用RR调度算法,通过抢占方式保证软实时任务优先于非实时任务。