BOP:项目余额
“Balance Of the Project”通常缩写为 BOP,这一简称在商业领域中广泛应用,旨在简化书写流程、提升信息传递效率。其对应的中文含义为“项目余额”,常用于项目财务管理和进度追踪场景中。使用 BOP 能够帮助团队快速辨识关键数据,尤其在报告、会议及日常沟通中起到高效沟通的作用。
Balance Of the Project具体释义
Balance Of the Project的英文发音
例句
- In the investment management, the need to increase the level of investment projects investigation to fulfill investment projects feasibility study process, profit and loss balance of the project, the introduction of scientific investment decision-making model and the development of investment strategic planning.
- 在投资管理方面,需要提高投资项目调查水平、履行投资项目可行性研究程序、进行项目盈亏平衡分析、引入科学投资决策模型和制定投资战略规划。
- Project finance is the long term financing of infrastructure and industrial projects based upon the projected cash flows of the project rather than the balance sheets of the project investors.
- 项目贷款是指基于项目现金流为还款来源而不是投资者资产的固定资产或工业项目长期贷款。
- Balance of the Development of Project and Finance with Macroregulation
- 发挥计划、财政、金融在宏观调控中的协调作用
- In this strong matrix, the balance of power is shifted to the project manager.
- 在强矩阵型结构中,权力向项目经理倾斜。
- Presents the composition of cold air distribution outdoor air systems and the design calculation of the total heat exchanger, fresh air handling unit, terminal device and air duct. Analyses the heat and humidity balance of the system. Provides a project example.
- 介绍了低温送风独立新风系统的组成及全热交换器、新风机组、末端设备、风道的设计计算,分析了其热湿平衡,给出了一个工程设计实例。
本站英语缩略词为个人收集整理,可供非商业用途的复制、使用及分享,但严禁任何形式的采集或批量盗用
若BOP词条信息存在错误、不当之处或涉及侵权,请及时联系我们处理:675289112@qq.com。