TCC:施工总成本

“施工总成本”(Total Construction Cost)在英文文档中常被缩写为TCC,这种简写形式便于快速记录和高效沟通。该术语尤其常见于机构管理和政府项目领域,例如在美国政府的官方文件和招标合同中,TCC被频繁用于指代项目所需的全部建设费用,以确保表述的准确性与简洁性。

Total Construction Cost具体释义

  • 英文缩写:TCC
  • 英语全称:Total Construction Cost
  • 中文意思:施工总成本
  • 中文拼音:shī gōng zǒng chéng běn
  • 相关领域tcc 美国政府

Total Construction Cost的英文发音

例句

  1. Based on the relevant theories of fuzzy fault tree, the index of fuzzy cost importance is proposed to assess the effect of each risk on the total construction cost during shield tunnel construction.
  2. 基于模糊故障树的相关理论,提出用模糊成本重要度的指标来评价盾构隧道施工中各风险对总成本的影响大小。
  3. In this paper, total construction cost is decomposed into costs of several sub-constructions according to the decomposability of system.
  4. 工程造价估算是利用某种方法,对工程投资费用所作的一个预先估计或预测。
  5. Expenses of construction corporation material can account for 60 % ~ 70 % of total construction cost. Material budget can control usage of construction material, reduce waste and construction cost.
  6. 施工企业材料占整个施工成本的60%~70%,抓好材料预算编制的准确性是控制施工材料使用、减少浪费、降低施工成本的关键。
  7. More than 20 years of practice has proved that the general contracting has various advantages compared with the traditional DBB mode in terms of decreasing the total construction cost and shortening construction cycle.
  8. 20多年实施工程总承包项目的实践,证明工程总承包相对于传统的DBB模式具有各种优势,有利于项目总建设成本的降低、缩短建设周期。
  9. Probability estimation of total construction cost for hydropower project with fuzzy estimation of sub construction cost
  10. 子费用模糊估算的水电工程总造价概率估计