FAT:工厂验收试验

“工厂验收试验”(Factory Acceptance Test)在机构或军事领域中常被缩写为FAT。这一简称不仅便于快速书写和口头交流,也有助于提升专业文档的规范性和效率。作为设备或系统出厂前的关键检验环节,FAT旨在确保产品在交付客户前已完全符合技术标准与合同要求。

Factory Acceptance Test具体释义

  • 英文缩写:FAT
  • 英语全称:Factory Acceptance Test
  • 中文意思:工厂验收试验
  • 中文拼音:gōng chǎng yàn shōu shì yàn
  • 相关领域fat 军事

Factory Acceptance Test的英文发音

例句

  1. Following the completion of the integrated system checkout, supplier shall demonstrate the system to company at a factory acceptance test.
  2. 综合系统测试完成之后,供应商应在工厂验收测试时向公司演示该系统。
  3. The masts will be packed and loaded after the factory acceptance test in the factory onto a lorry or train, depends on the location where the factory are and the destination store will be.
  4. 根据工厂所在地和储存地点,在工厂验收试验(FAT)试验后将支柱装箱于货车或火车。
  5. The factory acceptance test ( FAT ) and site acceptance test ( SAT ) of distribution automation system should be done before system putting into operation in order to ensure the product's quality. Especially, feeder automation ( FA ) testing is the key process.
  6. 为保证配电自动化产品在用户验收阶段的产品质量,需要进行出厂试验(FAT)与现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。