“Site Acceptance Test”(SAT)是该术语的全称,常用于计算机与硬件领域,指设备或系统在用户现场进行的最终验收测试。为便于书写和使用,人们常将其缩写为SAT。其中文对应表达为“现场验收试验”,这一流程旨在确保交付成果符合预定规格并在实际运行环境中稳定可靠。
Site Acceptance Test具体释义
Site Acceptance Test的英文发音
例句
- The warranty period shall start from the date when both parties have signed for confirmation of qualification in the site acceptance test.
- 质保期的起始日,应为现场验收试验(SAT)通过后,经双方签字确认的日期。
- The factory acceptance test ( FAT ) and site acceptance test ( SAT ) of distribution automation system should be done before system putting into operation in order to ensure the product's quality. Especially, feeder automation ( FA ) testing is the key process.
- 为保证配电自动化产品在用户验收阶段的产品质量,需要进行出厂试验(FAT)与现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。
- " Licensor shall send its technical personnel to Job Site to take an acceptance test, with the assistance of the technical personnel of Licensee. "
- 许可方应派遣其技术人员到工作现场在被许可方技术人员的协助下进行验收考核
- Site Acceptance shall mean the final acceptance of the Equipment carried out by the Purchaser at Purchaser's Facility in accordance with the Acceptance Test Manual.
- 现场验收是指买方按照验收手册对买方设施上安装的设备所作的最后验收。