EUM:工程单位管理

“工程单位管理”(Engineering Unit Management,常缩写为EUM)是一种广泛应用于商业与管理领域的专业术语,主要用于高效协调和控制工程项目的各类单位资源。通过使用EUM这一简洁缩写,能够提升书写与沟通效率,便于在商务文档、流程规范及团队协作中快速引用与实施。

Engineering Unit Management具体释义

  • 英文缩写:EUM
  • 英语全称:Engineering Unit Management
  • 中文意思:工程单位管理
  • 中文拼音:gōng chéng dān wèi guǎn lǐ
  • 相关领域eum 管理

Engineering Unit Management的英文发音

例句

  1. Gansu Power Transmission and Transformation Engineering Company is a First Grade qualification construction unit approved by the state. In 2000, she carried out a management information system project.
  2. 甘肃送变电工程公司是具有国家壹级资质的送变电施工企业,她于2000年开发和实施了MIS系统。
  3. For completion information, besides transferring them to Party A and archival administrative department upon requirements, a set of complete and original engineering information with efficacy of law shall be transferred to archival department of the unit after they are reviewed by the higher engineering management department.
  4. 竣工资料除按要求做好向甲方和档案管理部门移交资料外,还必须将一套完整的、具有法律实效的原始工程资料经上级工程管理部门审核后,向本单位档案部门移交。