CPA:合同价格调整
“合同价格调整”(Contract Price Adjustment)在书面和日常沟通中常被缩写为CPA,这一简写形式便于快速记录和使用。该术语多见于政府部门及商业机构的合同管理场景,尤其在美国政府的采购和招标流程中应用广泛,用于指代因市场波动或条款变更而对合同价格进行的正式修订。
Contract Price Adjustment具体释义
Contract Price Adjustment的英文发音
例句
- This paper explains with example of cases the method and calculation procedures for the contract price adjustment of expressways under construction.
- 用实例论述了高速公路项目合同价格调整(CPA)的方法和计算步骤。
- In this model, the model input is the variation induced by factors, the conduction process are the contract for analysis of variation processes and the contract price adjustment process, the final output of the composition of the settlement costs.
- 工程变更对工程结算影响传导机理模型以工程变更的诱发因素作为该模型的输入,以工程变更的合同分析处理过程以及合同价款的调整过程作为该模型的传导流程,最终输出了结算费用的构成。
- The engineering cost management method in construction stage is introduced and discussed from project changes, contract price adjustment, project claim and other aspects. Author points out that engineering cost control in construction stage plays important roles.
- 介绍了施工阶段工程造价管理的方法,从工程变更、合同价调整、工程的索赔等方面进行了论述,指出施工阶段的工程造价管理是搞好工程质量的关键。
- Study on Method of Construction Contract Price Adjustment(CPA) under Building Materials Price Fluctuate
- 建材价格波动时施工合同价格调整(CPA)方法的研究
- This paper presents the contract price adjustment system and method applied in Xiaolangdi Multipurpose Dam Project, in consideration of the practices, and produces some relevant comments and suggestions.
- 结合工作实践,介绍了小浪底水利枢纽工程合同价格调整(CPA)体系与方法,提出了相关的意见和建议。