IPT:综合绩效任务
Integrated Performance Task(综合绩效任务)常被缩写为IPT,这种简写形式在书写和使用中更为便捷高效。该术语广泛应用于需要跨领域协作或综合性评估的场景中,尤其适用于尚未明确归类的复杂任务体系。通过缩写,专业人员能够快速指代这类涉及多维度考核的目标性工作。
Integrated Performance Task具体释义
Integrated Performance Task的英文发音
例句
- The system puts into effect the integrated performance of multiple task and automatic control & picture, character, sound, collection, statistics, record, analysis, printing and editing.
- 本系统实现了对图像、文字、声音、采集、统计、记录、分析、打印、试题编辑等多种任务的统一调度、自动控制。
- Objective : To assess the diagnosis value of applying integrated visual and auditory continuous performance task ( IVA-CPT ) and EEG biofeedback on children with attention-deficit - hyperactivity disorder ( ADHD ), and provide information for assisting diagnosis of ADHD.
- 目的:通过整合视听连续执行测试(IVA-CPT)和脑电神经电生理检测,探讨两种辅助诊断方法在ADHD诊断中的差异,为临床上选择ADHD辅助诊断方法提供参考。
- The aerodynamic / stealthy integrated design is aim to obtain the maximum lift to drag ratio under constraints of stealthy performance through the adjustment of local shape de-sign variables. The task of the structure optimization is to minimize the structural weight by adjusting the size of structural components.
- 气动/隐身一体化设计的任务是对局部外形设计变量进行优化,在满足隐身性能前提下,使升阻比最大;结构优化的任务是对结构尺寸进行优化,使结构重量最轻。
本站英语缩略词为个人收集整理,可供非商业用途的复制、使用及分享,但严禁任何形式的采集或批量盗用
若IPT词条信息存在错误、不当之处或涉及侵权,请及时联系我们处理:675289112@qq.com。