PME:电源管理事件
“Power Management Event”(电源管理事件)在计算机领域,尤其在驱动程序相关的技术文档中,是一个常见的专业术语。为了方便书写和使用,这一术语常被缩写为“PME”。该缩写不仅简化了技术交流,还有助于提高文档和代码的编写效率,是硬件与系统交互时用于管理电源状态变化的关键概念。
Power Management Event具体释义
Power Management Event的英文发音
例句
- Indicate how the service should respond when a power management event is received, such as a low battery or suspended operation.
- 指示接收到电源管理事件(PME)(如电池不足或操作挂起)时,服务如何响应。
- As the basis to discuss the main functions of power load management system and the main technical indicators, hardware interface design, data-driven and event handling, and other major processes.
- 并以此为基础,讨论电力负荷管理系统主要功能及主要技术指标,硬件接口设计,数据驱动和事件处理等主要流程。
- Under the competitive electric power market environment, the electrical power system becomes the management system by the original centralized management which separates mutually, increased each kind of uncertainty event possibility.
- 在竞争性的电力市场环境下,电力系统由原先的集中管理变为了离散的、相互分离的管理体系,增加了各种不确定性事件的可能。
- This event triggers an alarm that is automatically entered into the UPMC incident management system, which, in turn, notifies all Power server administrators of the problem.
- 这个事件触发一个警报,这个警报自动进入UPMC事件管理系统,进而通知所有Power服务器管理员。
本站英语缩略词为个人收集整理,可供非商业用途的复制、使用及分享,但严禁任何形式的采集或批量盗用
若PME词条信息存在错误、不当之处或涉及侵权,请及时联系我们处理:675289112@qq.com。